HOW TO INSTALL, OPERATE, AND MAINTAIN A VERTICAL HOLLOW SHAFT MOTOR

INSPECTION, LUBRICATION, WIRING, STARTUP, STORAGE, AND MAINTENANCE GUIDANCE FOR WORLDWIDE ELECTRIC WPEVHS MOTORS.

WorldWide Electric WPEVHS vertical hollow shaft motors are three-phase squirrel-cage induction motors designed to drive deep-well turbine pumps. This article summarizes the February 2024 Installation, Operation, and Maintenance Product Manual.

Use the complete manual and the specific motor’s nameplate for wiring, bearing selection, thrust limits, and installation requirements. This guide does not replace model-specific instructions.

Safety requirements

Electrical connections must be made by a qualified electrician. Disconnect all power before servicing, including accessory power sources where applicable. Install and ground the motor in accordance with local and national electrical codes, and wear ANSI-approved safety goggles when working with the equipment.

Keep guards in place and stay clear of moving parts. Running tests and regreasing procedures must be performed by qualified personnel using appropriate safeguards. Do not access internal components or change wiring while the motor is energized.

Confirm the application requirements

The manual lists these standard specifications and operating conditions:

Confirm that the motor horsepower, RPM, voltage, and other specifications match the pump and installation. Check the exact model against the manual’s Bearing Types / Sizes / Maximum Thrust Loads table. Do not assume every WPEVHS motor has the same allowable thrust load.

1. Inspect the motor before operation

With the motor safely isolated:

  1. Check the nameplate against the application requirements.
  2. Inspect the motor for shipping damage and loose fasteners.
  3. Turn the motor in its correct operating direction to confirm it turns freely.
  4. Have qualified personnel measure insulation resistance to ground. The manual specifies a reading of at least 500 megohms using an instrument capable of measuring that range.
  5. Remove the top cover and inspect the non-reversing ratchet for damage and free movement. Restore covers and guards before operation.

Correct rotation is counterclockwise when viewed from the top of the motor.

2. Fill the oil-lubricated bearing chamber

For frame 320 and above, fill the upper bearing chamber with oil before startup.

  1. Remove the oil-fill plug.
  2. Add ISO 32 turbine oil to the middle of the sight gauge. Do not overfill.
  3. Replace the fill plug.
  4. Check for leaks.

Understand the sight-gauge reading

With the motor at standstill, the operating oil level should be at the centerline of the sight gauge.

The level drops below center while the motor is running. The manual identifies this as normal lubrication activity, not automatically a fault. Do not add oil solely to restore the running level to the centerline.

Oil inspection and replacement

  • Inspect oil monthly for contamination.
  • Replace contaminated oil when detected.
  • Under normal operation, replace oil every 12 months.

The elevated oil level specified for extended storage is different from the operating level. See the storage section below.

3. Connect power, grounding, and accessories

Use the motor-specific connection diagram and the complete manual’s applicable wiring sketch. A grounding terminal lug is located inside the terminal junction box.

Starting connections

For the wiring arrangements identified in the manual:

  • The START connection is only for part-winding start (PWS).
  • Motors powered across the line, by a solid-state reduced-voltage soft starter, or by a variable-frequency drive must use the RUN connection.

Do not select a connection solely by horsepower. Confirm the exact voltage, model, and starting method with the applicable diagram.

Space heaters and winding RTDs

For 125–500 HP motors, the winding RTD leads are labeled A1/A2/A3, B1/B2/B3, and C1/C2/C3. The manual describes using them with a customer-supplied instrument to monitor winding temperature. Confirm heater ratings on the specific motor before energizing accessories.

Provide overcurrent or short-circuit protection in the control panel or starter, sized in accordance with the motor’s full-load current and applicable requirements.

4. Perform the pre-installation test

After inspection, required oil filling, electrical connection, and restoration of guards:

  1. Verify voltage at the motor leads against the motor rating. The manual specifies less than 2.5% imbalance between phases.
  2. Verify counterclockwise rotation when viewed from above.
  3. Monitor the test run for unusual noise, vibration, or high current.
  4. Run at no load for 2–3 hours, checking for irregularities and unusual sounds.
  5. After the no-load run-in, inspect bearing condition using safe methods to confirm there has been no overheating.

If incorrect phase sequence causes the non-reversing ratchet to prevent reverse operation, shut off and isolate power. Have a qualified electrician interchange any two line leads to correct rotation. Do not continue trying to run the motor against the ratchet.

5. Install the motor on the pump
  1. Confirm motor and pump specifications match.
  2. Drain the oil reservoir before lifting, where an oil reservoir is fitted.
  3. Attach crane hooks to the motor’s lifting lugs.
  4. Keep the motor vertical throughout installation. The manual warns that tipping it more than 10° from vertical can spill oil from the reservoir; this is not permission to install it at an angle.
  5. Mount on a structurally sound base to prevent vibration and misalignment.
  6. Refill the oil chamber to the proper operating level before operation.

If significant vibration is present after installation, check the base and alignment and contact the installation company.

6. Follow the inspection and lubrication schedule

Abnormal operating noise requires immediate shutdown and inspection.

Compare recorded sound levels with the exact model’s decibel table in the manual. The manual directs consultation with the manufacturer or repair center if readings exceed its listed levels by more than 10%. Ask WorldWide Electric to interpret unusual readings; these listed sound levels are not occupational noise-exposure limits.

Grease-lubricated bearings

The manual identifies grease fittings and discharge plugs for the lower bearing, and for the upper bearing on frames up to 280. Motors ship with grease for initial running. Additional lubrication may be needed in circumstances such as storage exceeding three months or exposure to construction dust.

Excessive or overly frequent lubrication can damage the motor. Use the applicable schedule rather than a single interval for every model.

The manual associates severe service with continuous operation and harsher conditions such as dirt, dust, or elevated ambient temperature. A lubrication table mentioning temperatures above 40°C does not establish approval to operate beyond the standard ambient rating. Confirm application suitability with WorldWide Electric.

The extracted schedule does not provide an interval for 300–500 HP. Contact WorldWide Electric for those motors rather than extrapolating.

Regreasing procedure

Qualified personnel should follow the manual’s procedure:

  1. Clean fittings so dirt cannot enter the bearing cavity.
  2. Use MOBIL POLYREX-EM, or equivalent polyurea-based grease with the same thermal properties, unless the nameplate specifies a special grease.
  3. Preserve grease compatibility; incompatible grease can significantly shorten bearing life.
  4. Use a low-pressure grease gun, adding grease until new grease appears at the discharge point, as directed in the manual.
  5. The manual calls for regreasing with the motor running for even distribution, followed by 10–30 minutes of continued operation.

All guards must remain in place, and personnel must stay clear of moving parts. If regreasing cannot be completed safely with appropriate safeguards, consult WorldWide Electric for the correct service method. Do not improvise grease quantities; the manual does not supply a universal measured quantity here.

7. Prepare the motor for storage

For extended storage of six months or more:

  1. Clean the exterior and the area inside the top cover.
  2. Cover air inlets and outlets to keep dust out.
  3. For motors with an oil-lubricated upper bearing chamber, fill oil to the top of the sight gauge for storage.
  4. Store in a clean, dry, low-humidity environment free of vibration, between 40°F and 80°F.

If stored outdoors, or installed outdoors without running for one week or more, the manual directs energizing the space heaters to prevent condensation. Have qualified personnel confirm accessory ratings and connect them safely.

Return to operation

Drain the old storage oil and replace it with new oil at the proper operating level: the middle of the sight gauge at standstill. Do not operate with the elevated storage oil level. Remove temporary inlet and outlet coverings before operation and repeat applicable pre-operation checks.

Troubleshoot common symptoms

Stop and safely isolate the motor before corrective work. The following summarizes areas to investigate; use the complete troubleshooting tables and qualified service personnel for diagnosis.

Do not assume every hot bearing needs more grease. The manual identifies both inadequate and excessive lubrication, as well as mechanical problems, as possible causes.

Warranty and service

The February 2024 manual specifies a two-year warranty from the date of sale/invoice, subject to WorldWide Electric’s warranty decisions and terms.

For a potential warranty claim:

  • Arrange inspection through an authorized EASA service center or other approved motor shop.
  • The service center must provide a written inspection estimate, and WorldWide Electric must issue a purchase order before inspection.
  • After inspection, the service center must submit the warranty repair report and detailed failure photographs for review.
  • If repair is approved, a written repair estimate and WorldWide Electric purchase order are required before repair.

The manual states that qualifying material or workmanship defects may result in repair or replacement. It also describes exclusions for labor or operating costs and purchaser responsibility for transportation associated with replacement. Refer to the full policy before arranging work.

Get technical assistance

View the complete vertical hollow shaft motor manual.

Document number: IOM-Electric-Vertical-Hollow-Shaft-Motors-02-10-2024
Manual revision: February 2024

Suggested article settings — remove this section before publishing
  • URL slug: vertical-hollow-shaft-motor-installation-operation-maintenance
  • Suggested category: Electric Motors
  • Suggested subcategory: Installation and Maintenance
  • Search tags: WPEVHS, vertical hollow shaft motor, deep-well turbine pump, ISO 32 turbine oil, non-reversing ratchet, thrust bearing, motor storage
  • Meta description: Learn how to install and maintain WPEVHS vertical hollow shaft motors, including oil levels, rotation checks, lubrication, storage, and troubleshooting.
  • Technical review: Confirm model-specific thrust limits, bearing arrangements, heater ratings, and wiring in the original manual before publication. Obtain lubrication guidance for 300–500 HP models. Clarify sound-level comparison methods with WorldWide Electric. Model tables, construction illustrations, and wiring diagrams are linked rather than reproduced.